by Jacky Tang | Apr 3, 2025
CLP uses grassland and pond surfaces for the installation of solar panels. 90MW Phase I project is equipped with a 9MW/18MWh battery energy storage system and 50MW Phase II is equipped with a 5MW/10MWh battery energy storage system. The stations promote agrivoltaic...
by Jacky Tang | Apr 3, 2025
Bobai Wind Farm, comprising 27 wind turbine generators, was commissioned in January 2025. It is CLP‘s first renewable energy project in Guangxi Zhuang Autonomous Region.
by Jacky Tang | Sep 27, 2023
Yangzhou Gongdao Solar Power Station is equipped with an 8MW battery energy storage system, which is the first large-scale battery energy storage system put into commercial operation in Jiangsu Province.
by Jacky Tang | Sep 27, 2023
Battery Energy Storage System (BESS) at Xundian II Wind Farm is a lithium battery-based installation with a capacity of 5MW.
by Jacky Tang | Sep 27, 2023
Yangzhou Gongdao Solar Power Station was connected to grid on 16 Aug 2023. Being equipped with an 8MW battery energy storage system, the project has an output capacity of 73.7MW. It is CLP’s first unsubsidised solar project in Mainland China and the first unsubsidised...