by Bai Tina | May 17, 2020
Sandu Wind project is CLP’s largest electricity project in Qiannan Prefecture, Guizhou Province. Sandu I is the first wind farm with the installed capacity of 99MW for one single phase among the CLP fully-owned wind farm projects and in Guizhou Province.
by Bai Tina | May 17, 2020
Rongcheng Wind Farm is located in the eastern part of Shandong Province. The farm was constructed in three phases and has a combined capacity of 147.8MW. It is a joint venture between CLP and a subsidiary of the China Shenhua Energy Group.
by Bai Tina | May 17, 2020
CLP formed a joint-venture company in 2009 with China Wind Power Group (CLP-CWP Wind Power Investment Limited). This company went on to form a joint venture with Shanghai Shenhua to develop and own Qujiagou and Mazongshan wind farms in Fuxin City, Liaoning. The total...
by Bai Tina | May 17, 2020
Penglai Wind Farm, located in Shandong province, is CLP’s second wholly-owned wind power project in the Mainland, after Jilin Qian’an Wind Farm Project. The 48MW project was commissioned in 2012.
by Bai Tina | May 17, 2020
Nanao Wind Farm is located on Nanao Island in Shantou, Guangdong and provides electricity to Shantou City. It is one of the earliest island-based wind power projects in the Mainland. CLP has an equity interest in phases II and III, which have a total capacity of 60MW....