Weihai I & II Wind Farms

Weihai I & II Wind Farms

Following the same model of cooperation at Changdao, CLP and a subsidiary of China Huaneng Group jointly developed another wind power project in Shandong at Weihai. With a total capacity of 69MW, Weihai Wind Farm supplies electricity to the nearby coastal area.
Shuangliao I & II Wind Farms

Shuangliao I & II Wind Farms

Located in Jilin Province, in the northeastern part of the Mainland, near the border with Inner Mongolia, Shuangliao Wind Farm has a total capacity of 98.8 MW. It is owned by a joint venture between CLP and a subsidiary of the China Datang Corporation.
Sandu Wind Farm

Sandu Wind Farm

Sandu Wind project is CLP’s largest electricity project in Qiannan Prefecture, Guizhou Province. Sandu I is the first wind farm with the installed capacity of 99MW for one single phase among the CLP fully-owned wind farm projects and in Guizhou Province.
Rongcheng I, II & III Wind Farms

Rongcheng I, II & III Wind Farms

Rongcheng Wind Farm is located in the eastern part of Shandong Province. The farm was constructed in three phases and has a combined capacity of 147.8MW. It is a joint venture between CLP and a subsidiary of the China Shenhua Energy Group.
Penglai Wind Farm

Penglai Wind Farm

Penglai Wind Farm, located in Shandong province, is CLP’s second wholly-owned wind power project in the Mainland, after Jilin Qian’an Wind Farm Project. The 48MW project was commissioned in 2012.