by Jacky Tang | Apr 3, 2025
CLP uses grassland and pond surfaces for the installation of 163,072 monocrystalline-N-type-bifacial solar panels with a total installed capacity of 90MW. It is equipped with a 9MW/18MWh battery energy storage system. The project also promotes agrivoltaics and...
by Jacky Tang | Sep 27, 2023
Yangzhou Gongdao Solar Power Station was connected to grid on 16 Aug 2023. Being equipped with an 8MW battery energy storage system, the project has an output capacity of 73.7MW. It is CLP’s first unsubsidised solar project in Mainland China and the first unsubsidised...
by Bai Tina | May 18, 2020
Meizhou Pingyuan Solar Power Station is located in Pingyuan County, Meizhou City, Guangdong Province, it began operation in June 2017, with an installed capacity of 36.10MW. CLP acquired 100% equity of the project in January 2019.
by Bai Tina | May 18, 2020
Lingyuan Solar Power Station is located in Lingyuan City, Liaoning Province, and is the second renewable farm constructed by CLP Group in the northeast of China . The power station has installed capacity of 20 MW and was connected to the grid for power generation on...
by Bai Tina | May 18, 2020
CLP Yunnan Xicun Solar Power Station is CLP’s 1st wholly-owned solar power station in the Mainland. The project comprises of two phases, with each phase of 42MW generation capacity (in alternate current), which is equivalent to 50MW direct current capacity. Xicun I...